Services

Five disciplines, executed as one.

Whether your project is a single finished basement or a full-home transformation, our approach is the same: clear scope, clear quote, clear schedule — backed by Manitoba-rated materials and Manitoba-trained crews.

01

Basement Development

Turn unfinished square footage into the most-used room in the house.

We build basements that feel like a continuation of the main floor — not a separate country downstairs. That means paying attention to ceiling height, egress window requirements, moisture management, and how the space actually connects to the rest of the home. We've finished basements as home theatres, legal secondary suites, guest quarters, home gyms, and full family rooms across Winnipeg and the surrounding communities.

Typically includes

  • Permit, engineering, and inspection management
  • Framing, insulation, and vapour barrier to Zone 7A spec
  • Electrical and plumbing rough-in and finish
  • Level-five drywall and finish carpentry
  • Flooring, trim, and custom built-ins
  • Egress window cuts and basement walk-outs where needed
Typical timeline
4 – 10 weeks of active construction
Book a free consultation

02

Drywall & Taping

Level-five finishes that read flat under raking light.

Drywall is where careful work stops being theoretical and starts being visible. Our crews tape, skim, and finish to a level-five standard when the lighting conditions demand it — and to a clean Level 4 when that's the right call for the space. We handle popcorn ceiling removal, whole-home finishing after rough trades, repairs after plumbing or electrical work, and the fine skim-coating that separates professional work from weekend warriors.

Typically includes

  • Board and tape installation
  • Level 3, 4, or 5 finishes depending on lighting and spec
  • Popcorn ceiling removal and replacement
  • Skim-coat resurfacing of existing plaster walls
  • Dust containment for occupied homes
  • Paint-ready handoff or full finish with primer
Typical timeline
1 – 3 weeks
Book a free consultation

03

Home Renovations

Kitchens, baths, and whole-home updates executed as a single scope.

Renovations break down when they're handled as a collection of small trade jobs stitched together by whoever shows up that day. We manage renovations as a single coordinated scope: one contract, one schedule, one point of contact. That coordination is why our projects finish on the week we said they would. We've delivered kitchens, primary baths, main-floor reconfigurations, top-to-bottom updates, and heritage-respecting updates to pre-war homes.

Typically includes

  • Design-assist and material selections support
  • Demolition, abatement where required
  • Layout changes with engineered structural work
  • Full mechanical upgrades (electrical, plumbing, HVAC)
  • Custom cabinetry, countertops, and finish carpentry
  • Flooring, tile, paint, and final finish work
Typical timeline
6 weeks to 8 months
Book a free consultation

04

Steel & Stud Framing

Interior wall framing, partitions, bulkheads, and drop ceilings — commercial-grade metal studs and residential wood framing.

Framing is the bones of every interior finish. Our crews frame partition walls, bulkheads, soffits, and suspended ceiling systems for commercial tenants, office fit-ups, retail build-outs, basement developments, and residential renovations across Manitoba. We handle both commercial-grade steel stud assemblies and residential wood framing — cut, laid out, and installed to spec so the trades behind us work against straight, plumb, square walls.

Typically includes

  • Layout and shop drawings where required
  • Steel stud framing for commercial partitions (20 – 25 gauge)
  • Wood stud framing for residential walls and bulkheads
  • Metal and wood drop ceiling and suspended ceiling systems
  • Soffits, bulkheads, and ceiling transitions
  • Coordination with mechanical, electrical, and plumbing rough-in
  • Fire-rated and acoustic assemblies to code specification
Typical timeline
1 – 3 weeks for typical scope; longer for large commercial fit-ups
Book a free consultation

05

Commercial Build-outs

Tenant improvements and commercial fit-ups on commercial timelines.

Commercial schedules don't flex the way residential ones do. A restaurant has an opening date. A retail tenant has a lease that starts the meter. A medical office has equipment arriving. We run commercial projects with the documentation, permit rigour, and schedule discipline the category demands — occupancy classifications, accessibility compliance, life safety, adjacent-tenant coordination, and the tight-window execution that commercial build-outs require.

Typically includes

  • Commercial permits and occupancy coordination
  • Accessibility (barrier-free) design and construction
  • Fire, life safety, and commercial mechanical coordination
  • Office, retail, restaurant, and medical office build-outs
  • After-hours and phased work to protect adjacent tenants
  • Commercial-grade finishes rated for high-traffic use
Typical timeline
6 – 14 weeks
Book a free consultation

Every project starts with a conversation

Tell us about your build.

Book a free consultation — we'll walk through scope, schedule, and what the work actually involves. No obligation.

Book a Free Consultation (204) 880-4957